JOVO Energy Co., Ltd.Dongguan. was founded on September 25th, 2003, which is located at the center of Petrochemical Base, Lisha Island, Humen Harbor, Dongguan, back to Pearl River, and Sugang Avenue is crossing over in the front, with very convenient traffic condition.

The company has a 50,000-tones oil and gas petrochemical dock (80,000 tones of hydro-structure), first, secondary and tertiary storage, transport and processing facilities with 132,000 cubic meters of (LPG) tank, finished oil and methanol storage and transport facilities with 125000 cubic meters, DME production, transport and processing facilities with annual output of 200,000 tones, and the first LNG storage, transport and processing facilities with 170,000 cubic meters. With the total investment exceeding RMB 1.3 billion, the project was put into production in 2009, and now it has developed to be one of main energy suppliers in South China and is continuously growing.